GE MIFIIPI55E10HI00 | Multilin MiF II Feeder Protection Relay

$4,700.00

The MIFIIPI55E10HI00 is identified in an independent relay-model database as a GE MIFII feeder-protection model, with documented references to both MIFII V3.03 and V4.01 versions.
Brand model:GE 
Product Name:MIFIIPI55E10HI00
Warranty: 1 year
Origin:USA
HS code:85389000.00
Inventory: Spot/Futures
Goods condition: Brand new
Delivery time: 3-4days/1month

Brand: Model/SKU: GE MIFIIPI55E10HI00-1

Get a Quote / Inquiry

Phone/WhatsApp/Wechat:
WeChat QR Code WhatsApp

Description

  • Brand: GE Digital Energy / GE Multilin
  • Full Model Number: MIFIIPI55E10HI00
  • Product Family: MiF II Feeder Management Relay
  • Lifecycle Status: Legacy / historical product family; exact service status to be verified
  • Core Function: Feeder protection, measurement, monitoring, and control
  • Protection Type: Microprocessor-based feeder protection relay
  • Software Versions: Listed in relay-model references under MIFII V3.03 and V4.01 configurations
  • Typical Applications: Industrial feeders, electrical distribution, utility protection
  • Communications: Model-specific communication configuration; verify installed interface before replacement
  • Stock & Condition: Availability and physical condition to be confirmed by lot
  • Shipping: Emergency dispatch subject to physical stock verification and order cutoff

The MIFIIPI55E10HI00 is identified in an independent relay-model database as a GE MIFII feeder-protection model, with documented references to both MIFII V3.03 and V4.01 versions. This matters during replacement because the exact suffix and software revision should be matched against the installed relay before a PO is released.

 

Obsolescence & Supply Chain Deep Dive

A failed feeder relay can turn a relatively contained protection problem into an extended outage when the installed relay is from an older protection platform. The GE Multilin MIFIIPI55E10HI00 belongs to the MIFII feeder-protection family and is intended for protection, monitoring, and control of electrical feeders. Its exact hardware and software configuration must be established from the relay nameplate and existing settings file; public listings contain conflicting technical descriptions, so generic specifications should not be treated as a substitute for the customer’s original configuration.

For a functioning protection scheme, retaining the established relay architecture can avoid the engineering and commissioning costs of migrating to an unrelated protection platform. TCO should include relay engineering, protection-setting validation, panel modification, CT/VT wiring checks, testing, outage duration, and commissioning labor. A verified replacement MIFIIPI55E10HI00 can be economically preferable when the existing switchgear and protection design remain suitable—particularly when an immediate spare is available and a full relay migration would require a new settings study.

 

Compatibility & Replacement Matrix

Replacement Scenario Classification Engineering Requirement Estimated Switch Time
Exact MIFIIPI55E10HI00 with matching hardware and software configuration Drop-in Replacement Verify model suffix, hardware revision, settings, wiring, and communications 2–6 hours
Same model with different firmware revision Software Compatible — Verify First Compare firmware, settings file, and protection-function availability 4–8 hours
Different MIFII model with similar protection functions Software Compatible — Engineering Review Required Compare protection elements, I/O, communications, and settings 1–2 days
Different GE Multilin relay family Hardware Modification Panel, wiring, settings, communications, and commissioning review 2–5+ days

The available relay-model reference specifically lists MIFIIPI55E10HI00 against MIFII versions 3.03 and 4.01. That makes firmware/software revision a procurement checkpoint rather than an incidental detail.

Field Traps — Watch Out

  • Firmware and settings mismatch: Confirm whether the installed relay is running the V3.03 or V4.01 configuration before approving a replacement. A model-number match alone does not prove identical protection behavior.
  • CT/VT configuration: Verify CT ratios, VT ratios, phase sequence, frequency, and protection-setting groups against the existing relay settings before energizing the replacement.
  • Communications configuration: Record the installed communications interface, address, protocol, and station configuration before removing the original relay.
  • Output assignment: Confirm trip, alarm, breaker-control, and auxiliary-contact assignments against the existing protection scheme rather than assuming another MIFII variant has identical I/O.
GE MIFIIPI55E10HI00

GE MIFIIPI55E10HI00

Quality Assurance & Testing SOP

The pre-shipment procedure should identify the relay first, then validate the functions that can be tested without altering the customer’s protection settings.

  • OEM identification inspection: Verify GE/Multilin markings, model number, serial number, revision, and rating information.
  • OEM anti-counterfeit visual inspection: Inspect the enclosure, front panel, display, labels, PCB construction, connectors, terminal blocks, and component markings for unauthorized modification.
  • Physical condition inspection: Check mounting hardware, terminal screws, communication ports, front-panel controls, display, and housing for damage.
  • Power-on self-test (POST): Energize the relay using the verified supply specification and confirm normal startup and diagnostic indications.
  • Front-panel diagnostic test: Check display operation, LEDs, keypad/buttons, alarm indications, and available self-diagnostic status.
  • Protection-function verification: Where the test setup permits, inject representative current/voltage signals and verify applicable protection pickup and timing functions.
  • Trip-output test: Confirm assigned relay outputs and contact operation against the documented test configuration.
  • Metering verification: Compare measured current and voltage values with calibrated test inputs.
  • Communication test: Verify the installed communications interface and confirm that the relay responds correctly without overwriting customer-specific settings.
  • Settings preservation: Record the existing configuration where authorized and avoid loading a replacement settings file unless specifically approved.
  • Final acceptance record: Photograph the nameplate and front panel and record serial number, revision, test date, and test results.

Actual test results should be attached to the specific physical relay supplied. They should not be replaced by generic model-level specifications.

 

Procurement & Lifecycle FAQ

Is the genuinely in stock, and what is the cutoff for emergency shipping?

Physical inventory should be confirmed against the actual relay before the PO is released. For emergency requirements, provide quantity, destination, and required dispatch time so the available unit and shipping cutoff can be confirmed.

How do you guarantee the condition and authenticity of a legacy ?

The procurement record should identify the physical relay by model, serial number, revision, and visible GE/Multilin markings. Visual inspection, power-up diagnostics, front-panel testing, and applicable relay-function testing should be documented before shipment.

Are there firmware compatibility issues engineers should check before issuing the PO?

Yes. is documented against multiple MIFII software versions, including V3.03 and V4.01. Engineers should compare the installed relay’s firmware, protection settings, I/O assignments, and communications configuration with the proposed replacement.

Can another MIFII relay replace ?

Not automatically. The replacement must be checked for protection functions, hardware configuration, CT/VT inputs, output assignments, communications, firmware, and settings compatibility. A similar family designation is not sufficient evidence of functional equivalence.

What warranty and return terms should be included in the purchase order?

Specify the exact model, condition, serial number where applicable, warranty duration, DOA definition, inspection period, return authorization procedure, and acceptance criteria. For a protection relay, the PO should also state that the supplied hardware must match the approved protection configuration before field installation.

mingpian
xcd